S no. |
Name of Project/Work |
Deptt. |
Value of work Rs. In Crore |
1 |
Name of Work:-Reconstruction of Gadarpur-Dineshpur- Matkota-Haldwani (SH-5) Motor Road from Km 0.000 to 16.000 and Widening and Strengthening of Manunagar-Gadarpur-Dineshpur-Matkota Haldwani (SH-5 Extn.) Motor Road Under CRIF. |
PWD Uttrakhand |
44.52 |
2 |
C/o ROB Level X Ing No. 15 C on Ghaziabad- Sre Rail Section Near Raj Chaupla Over Modinagar Hapur Road. |
UPSBCL |
25.98 |
3 |
C/O 84.00 MTR SINGLE BRIDGE AT KAITHERGAON JAGOI SHIV MANDIR ROAD I/C C/O ROAD UPTO KRISHI VIGYAN KENDRA IN SULT CONSISTENCY OF DISTRICT ALMORA IN THE STATE OF UTTRAKHAND |
PWD Uttrakhand |
11.69 |
4 |
Contract for Survey Design, DPR preparation , rural Water Supply O&T 120 months of Fully Functional Schemes for Bareily Circle. Badaun |
Jal Nigam |
68.76 |
5 |
Design and Construction of 2 lane Rail Over Bridge at railway Crossing no 227C/2T at Km 1322/12-14 Jhansi Kanpur Rail Section NCR Raipur – Gajner - Moosa nagar near Rasoolpur Gogumau Railway Station in District Kanpur Dehat |
UPSBCL |
30.34 |
6 |
Construction of 02 Number of Bridges (Two Lane) over Pahadi River along with Approaches and Protection works from Bhuradev Mandir to near Maa Shakumbhari Devi Mukhya Mandir in Distt. Saharanpur, (U.P.) |
UPSBCL |
27.09 |
7 |
"Construction of Rail Over Bridge at L Crossing No 5 C on Kanpur – Tundla rail Section at Km 1091/9-11 between Kancausi phaphood railway Section in district kanpur dehat |
UPSBCL |
15.46 |
8 |
Construction of 2 Lane ROB in lieu of at L-Xing 70 at km.148/5-7 on Meerut Saharanpur Rail Section at Deoband in Distt. Saharanpur |
UPSBCL |
17.18 |
9 |
Execution of tubewell based Village Water supply schemes to various villages in the district of Saharanpur under Jal Jeevan Mission-Har Ghar Jal Yojna |
Jal Nigam |
354.00 |
10 |
Improvement / Strengthening of Kanda – Saniudiyar – Rawatsera Motor Road from 1 to 40 under CRIF (MDR BG-6) in District Bageshwar / Pithoragarh. |
PWD Uttrakhand |
19.02 |
11 |
Strengthening work from km 10.000 to 25.000 and km 48.000 to 77.100 km of NH 309B (Almora - Panar - Ghat Balance Work) under annual plan 2020-21 on EPC Mode in the state of Uttarakhand |
PWD Uttrakhand |
17.04 |
12 |
Improvement of Riding Quality of NH-121(309) from KM. 189.00 to 205.00 (Salondhar to Krisal), KM. 218.00 to 238.00 (Paithani to Musagali) and KM. 243.00 to 263.115 (Pabon to Buakhal) in the state of Uttarakhand under annual plan 2021-22. |
PWD Uttrakhand |
31.47 |
13 |
Construction of 4-lane ROB and its approches in liue of existing level crosing No. 43-B at Km 2.400 on NH-121 (New 309) in the state of Uttarakhand under EPC mode. |
PWD Uttrakhand |
74.04 |
14 |
Strengthening and road safty work from km 0.00 to 10.00 km 26.00 to 48.00 km and road safty work from km 22.00 to 26.00 km on NH - 309 B (Almora - Panar - Ghat Motor Road) in the state of Uttarakhand under annual plan 2019-20.
|
PWD Uttrakhand |
15.69 |